SECTION .1100 ‑ FUEL ALCOHOL PERMITS
14B NCAC 15C .1101 APPLICATION FOR FUEL ALCOHOL PERMIT: OPERATION
(a) In addition to the qualifications required by G.S. 18B‑900 and the application requirements of 14B NCAC 15C .0102(b) and (c), an applicant for a Fuel Alcohol Permit shall provide the following information to the Commission:
(1) Federal Operating Permit number and a photocopy of the Federal Operating Permit; and
(2) detailed diagram of the fuel alcohol plant premises, identifying roads, streams, lakes, buildings, and other structures on or features of the land that will show the precise location where plant operations will occur.
(b) No person shall operate a fuel alcohol plant without first applying for and receiving a Fuel Alcohol Permit from the Commission.
History Note: Authority G.S. 18B-100; 18B-203; 18B‑207; 18B‑1105(b);
Eff. January 1, 1982;
Amended Eff. May 1, 1984;
Transferred and Recodified from 04 NCAC 02T .1101 Eff. August 1, 2015;
Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. August 19, 2017;
Readopted Eff. September 1, 2026.